Toll Integrator Selected Proposer - September 2014

The Indiana Finance Authority will hold a public hearing on September 29, 2014, at 5:00pm at the Sheraton Riverside Hotel, Riverside Ballroom, 700 West Riverside Drive in Jeffersonville to accept public comment about the selected proposal and contract, and the proposal-evaluation process.  A simulcast will also take place at the University of Louisville Shelby Campus, Founders Union Building, Room 218A, 9001 Shelbyville Road, at the same time.

The IFA will use the public comment to make its final determination in recommending the preferred tolling operator to receive approval consideration from Governor Mike Pence and review by the Indiana State Budget Committee.  The public may submit advance comments about the proposal, contract and proposal-evaluation process prior to the hearing.  Those comments can be sent via e-mail to IFA Project Manager Silvia Perez at sperez@ifa.in.gov, or via mail to One North Capitol, Suite 900, Indianapolis, IN 46204.

All comments must be submitted no later than 5:00pm on September 29th to be considered.

ORB TSP Notice of Public Hearing

Written Statement for ORB Toll Procurement

LSIORB RFP Toll Services Agreement Executed

LSIORB RFP Toll Services Agreement Exhibits

LSIORB RFP Technical Proposal Volume I

LSIORB RFP Technical Proposal Volume II

LSIORB RFP Price Proposal Form G

LSIORB RFQ Book 1

LSIORB RFQ Book 2

Preliminary Selection



Additional Information


Technical Information

Note: The following files are posted in Adobe Acrobat 10. To download the latest version of Adobe, click here.

Planning Documents

ORB East End Crossing Roll Plot
Supplemental Draft Environmental Impact Statement and Section 4(f) Evaluation
Executive Summary
Appendix A - Project Alternatives
Appendix B - Resources/Data
Appendix C - Agency Coordination
Appendix D - Section 106
Appendix E - Federal State and Local Letters
Appendix F - Public Involvement
Appendix G - Financial Documents
Appendix H - Traffic Reports
Section 4

Bridges

Concept Plans

Harrods Creek Bridge
Ramp A Bridge
River Approach Bridge
Wolf Pen Bridge

Geotechnical Information

Geotech Report Wolf Pen Branch Road
River Approach Boring Logs for Scour Analysis DRAFT
River Approach D50 95 Tabulation for Scour Analysis DRAFT
River Approach Scour Analysis
Roadway
Concept Plans
Layout Sheet and Typicals
Plan and Profile
Right of Way
MOT
Coordinate Control
Conceptual Signing and Striping
Geotechnical Information
Report of Geotechnical Exploration
Cross Sections
I-71 S Interchange
KY 841-1
KY 841-2
I-71 Ramp Interchange
Ramps
WPBR
Tunnel
Concept Plans
Layout Map 
Geotechnical Information
Geotechnical Data Report Pillar - New
Geotechnical Data Report North Bound - New
Geotechnical Data Report South Bound - New
Complete Geotechnical Data Report Vertical Borings

Section 5

Bridges

Aesthetic Concept Renderings
EEB Renderings and Graphics
Preliminary Design Plans
ASF Section 7 Preliminary Design Plans
ASF Section 7 Preliminary Design Plans Roadway
ASF Section 8 Upper River Road Profile
Geotechnical Information
Geotechnical Engineering Report
Hydraulics
ASF Section 7 Preliminary Design Plans Water Surface
Section 6

Bridges

Concept Plans

Section A Final Bridge 21 Plans
Section A Final Bridge 22 Plans
Section B Final Bridge 20 Plans
Section C Final Bridge 17 Plans
Section C Final Bridge 18 Plans
Section C Final Bridge 19 Plans
Section C Final Brook Plans
Section D Final Bridge 16 Plans
Section E Final Bridge 1B 1 Plans
Section E Final Bridge 1B 2 Plans
Section E Final Bridge IB 3 Plans
Section E Final Bridge IB 4 Plans
Section E Final Bridge IB 5 Plans
Section E Final Bridge IB 6 Plans
Section E Final Bridge IB 7 Plans
Section E Final Bridge IB 8 Plans
Section E Final Bridge IB 9 Plans
Section E Final Bridge IB 10 Plans
Geotechnical Information
Sections A, B, C, D, E Data Report
Roadway
Concept Plans
Section A Final Road Plans
Section B Final Road Plans
Section C Final Road Plans
Section D Final Road Plans
Section E Final Road Plans
Cross Sections
Section A Final Road Cross Section
Section B Final Road Cross Section
Section C Final Road Cross Section
Section D Final Road Cross Section
Section E Final Road Cross Section
 

Toll Integrator RFP

Notice of Toll Integrator RFP

Request for Qualifications to Provide, Operate, Manage, and Maintain a Toll Collection System and Provide Back Office Toll Collection and Customer Service for the Louisville-Southern Indiana Ohio River Bridges Project through a Toll Services Agreement - Issued October 18, 2013; SOQ Due Date December 10, 2013

Supplemental Provisions 

Q&A Matrix

LSIORB SOQ Team Members

LSIORB SOQ Proposer Teams that Passed the SOQ Evaluation

ORB Toll Procurement Noticed EIS

Economic Impact Study

Notice of RFP - Dated May 23, 2014; Responses due by July 14, 2014 at 3:00pm est.

ITP

ITP Exhibits

ITP Forms

Toll Services Agreement

Toll Services Agreement Exhibits

Technical Requirements

ITP - Addendum #1 - June 26, 2014

ITP Exhibits  

ITP Forms  

Toll Services Agreement

Toll Services Agreement Exhibits

Technical Requirements

ITP - Addendum #2 - July 11, 2014

ITP Exhibits

ITP Forms

Toll Services Agreement

Toll Services Agreement Exhibits

Technical Requirements