IN.gov - Skip Navigation

Note: This message is displayed if (1) your browser is not standards-compliant or (2) you have you disabled CSS. Read our Policies for more information.

Amber Alert
Amber Alert - TEST
Subscribe for e-mail updates

IDEM > Permitting > Water Permits > Wet Weather - CSO & Storm Water (Rule 5, 6, & 13) > Storm Water Permitting > Industrial Storm Water Permitting (327 IAC 15-6, Rule 6) > Rule 6: Permit Renewal Rule 6: Permit Renewal

A new Rule 6 Notice of Intent (NOI), proof of publication, and requisite filing fee must be submitted to IDEM every 5 years (Notice of Intent (NOI) Letter Submittal). The same sampling and reporting requirements apply.

Permit renewals are required to be submitted ninety (90) days prior to the expiration of a general permit.

In addition to the information contained within the Notice of Intent letter, the submittal is required to contain an application fee of $50 and a proof of publication. The following guidance should be followed for all permit renewals:

  • Submit the $50 application fee.
  • Advertise the project in a newspaper of general circulation for a minimum of one day. A new notice is required to continue the operation at the facility. Submit the new Proof of Publication with the Notice of Intent application.

Upon renewal, the permit “effective date” will begin on the expiration date of the previous 5 year permit term.

For more information regarding the applicability requirements for 327 IAC 15-6, please contact the Storm Water Permits Coordinator.

Stay Connected

You are leaving the IN.gov website. By clicking OK, you will be taken to a website that is not affiliated with the State of Indiana and may have different privacy and security policies. The State of Indiana is not responsible for, and does not endorse, guarantee, or monitor content, availability, viewpoints, products, or services that are offered or expressed on this non IN.gov portal website.