Note: This message is displayed if (1) your browser is not standards-compliant or (2) you have you disabled CSS. Read our Policies for more information.
Number |
Memo Date |
Effective Date |
Affected Design Manual Section |
Subject |
PDF Files |
||
| Policy | Advisory |
Attachments |
|||||
13-17 |
08/15/13 |
Immediately |
26-2.0, Figure 26-2D |
Location Control Route Survey (LCRS) and LCRS Plat | Advisory | Section 26-2.0, Figure 26-2D |
|
13-16 |
08/15/13 |
Immediately |
26-1.01 | Survey Transmittal Deliverables Related to Geo-Coordinated Survey | Section 26-1.01 | ||
13-15 |
08/14/13 |
See memo |
None | HMA Pavement Pay Items for 2014 Standard Specifications Section 402 | Advisory | Mixture Type Conversion Table, USP HMA |
|
13-14 |
08/08/13 |
Immediately |
Ch. 10, Ch. 11, 402-5.05, 402-5.06, 402-6.01(03) | Indiana Design Manual Rewrite | |||
13-13 |
07/26/13 |
Letting on or after 09/01/13 |
45-1.02(06), 76-3.02(05), 76-3.02(06) |
Centerline and Edge Line Rumble Stripes | Advisory | Section 45-1.02(06), 76-3.02(05), 76-3.02(06) |
|
13-12 |
06/12/13 |
Stage 2 Submission On or After July 1, 2013 |
78-3.04, 78-5.0, 78-6.0, 78-7.0 | Lighting Design Procedure | Section 78-3.04, 78-5.0, 78-6.0, 78-7.0 Fig 78-5B, Fig 78-5C |
||
13-11 |
05/29/13 |
Immediately |
See memo | Indiana Design Manual Errata and Editorial Revisions | Advisory | ||
13-10 |
04/15/13 |
Immediately |
51-12.0 | Roundabouts | Roundabout Design Checklist | ||
13-09 |
04/12/13 |
Preliminary Field Check on or after 06/01/13 or as noted |
Chapters 49 & 55 | Small Structure Replacement, Guardrail Runout Length | Advisory | RDG Table 5-10(b) | |
13-08 |
03/27/13 |
Immediately |
Chapter 18 | Indiana Design Manual Rewrite | |||
13-07 |
03/27/13 |
Letting on or after 09/01/13 |
77-4.05 | Signal Display | Advisory | Section 77-4.05 | |
13-06 |
03/27/13 |
Letting on or after 09/01/13 |
77-5.05 | Signal Electrical System | Section 77-5.05 | ||
13-05 |
03/04/13 |
Immediately |
203-2.02(02) | In-Kind Replacement Policy | Policy | Section 203-2.02(02) | |
13-04 |
03/04/13 |
Immediately |
203-2.02(10) 201-1.05 thru 1.08 Figs 201-1A thru 201-1G |
Flowline Elevation, Pipe Material Selection |
Section 203-2.02(10) Section 201-1.05 thru 1.08 and figures |
||
13-03 |
02/08/13 |
Ready for Contracts on or after 04/01/13 |
82-6.03 | 2013 Interstate Highways Congestion Policy (IHCP) | Policy | ||
13-02 |
01/25/13 |
Stage 1 Submission on or after 03/31/13 |
Ch. 15 | INDOT CAD Standards Manual | CAD Standards Style Sheet | ||
13-01 |
01/07/13 |
Immed |
See memo | Indiana Design Manual 2013 | Advisory | IDM Chapter Reorganization | |
Number |
Memo Date |
Effective Date |
Affected Design Manual Section |
Subject |
PDF Files |
||
| Policy | Advisory |
Attachments |
|||||
| 12-21 | 10/05/12 | Stage 2 Submission on or after 12/21/12 | 409-9.0 | Use of AASHTO LRFD Bridge Design Specifications | Policy | ||
12-15 |
06/08/12 |
09/12/12, Letting |
52-11.01, item 4 | Microsurfacing | RSP 411-R-432 | ||
12-10 |
06/06/12 |
09/12/12, Letting |
83-2.03(01) | Work-Site Speed Limit | Advisory | RSP 801-C-228 | |
12-09 |
06/06/12 |
09/12/12, Letting |
Figs 404-4B, 404-4C | Bridge Railings | RSP 706-B-197 Fig 404-4B Fig 404-4C |
||
12-08 |
05/17/12 |
09/12/12, Letting |
410-5.01(06), 410-5.01(07) |
Mechanically-Stabilized-Earth Retaining Wall Design | Advisory | RSP 731-R-597 Fig 410-5(0)A Fig 410-5(0)B |
|
12-07 |
05/15/12 |
09/12/12, Letting |
83-2.06 | Portable Changeable Message Sign | RSP 801-C-229 Fig 83-2E |
||
12-02 |
02/16/12 |
Immed |
31-4.05(06) | Pipe Lining | Advisory | ||
Number |
Memo Date |
Effective Date |
Affected Design Manual Section |
Subject |
PDF Files |
||
| Policy | Advisory |
Attachments |
|||||
11-25 |
12/22/11 |
04/13/12, Letting |
52-11.01 item 5 | Ultrathin Bonded Wearing Course | RSP 414-R-590 | ||
11-12 |
07/08/11 |
Immediately |
See memo | Metric-Units Plans | |||
11-09 |
04/05/11 |
05/11/11, Letting |
49-5.01(04) | High-Tension Cable-Barrier System (CBS) | RSP 627-R-546 RPD 627-R-546d |
||
Number |
Memo Date |
Effective Date |
Affected Design Manual Section |
Subject |
PDF Files |
||
Policy |
Advisory |
Attachments |
|||||
09-33 |
12/14/09 |
03/03/10, Letting |
51-1.08 | Modification Project Which Requires American Disability Act (ADA) Component Upgrades | |||
09-13 |
05/08/09 |
09/10/09, Letting |
75-6.01 | Overhead Box-Truss Sign Structures & Foundations | |||
07-10 |
07/26/07 |
Immed |
82-3.05 | Worksite Increased-Penalty Signs | RPD Eng. 801-R-542d RPD Eng. 801-R-543d R RPD Eng. 801-R-544d RPD Met. 801-R-542d RPD Met. 801-R-543d RPD Met. 801-R-544d |
||
03-07 |
7/02/03 |
Immed |
unknown | Policy for Context Sensitive Solution | |||
01-14 |
12/10/01 |
Immed |
unknown | Water Main & Sanitary Sewer Construction in Contracts | |||