PAGE 1 INDIANA DEPARTMENT OF TRANSPORTATION RUN DATE : June 30, 2000 CONTRACT BID LETTING RESULTS LETTING DATE : June 20, 2000 (BY COUNTY) CONTRACTOR'S DATE TO BE COUNTY CONTRACT # DESCRIPTION - LOCATION CONTRACTOR BID COMPLETED CARROLL B -24583-A BRIDGE REPLACEMENT ON US 421 AWARD PENDING OVER DEER CREEK, 0.27 km SOUTH OF SR 25 (RP 147+08) DAVIESS B -24973-A BRIDGE REPLACEMENT AND CLR, INC. 1,285,139.20 130 W.D. GREENE ENVIRONMENTAL MITIGATION ON VINCENNES , IN US 231 OVER FIRST CREEK, 2.4 km SOUTH OF SR 558 AND AT THE NORTHWEST QUADRANT OF GREENE CO RDS 500S & 700W DECATUR T -24618-A TRAFFIC SIGNAL MODERNIZATION HENDERSON, H.E., INC. 219,680.37 11/15/00 MORGAN AND NEW ON SR 39 AT MORTON MARTINSVILLE , IN BARTHOLOMEW AND HARRIET ST. IN MARTINSVILLE; SR 7 AT SR 46 AND MARR ROAD IN COLUMBUS; SR 3 AT SR 46 E. JCT. DEKALB RS-24672-A ASPHALT RESURFACE ON US 6 JOHNSON, S.E. COMPANIES 2,547,371.55 12/01/00 FROM SR 427 IN WATERLOO TO MAUMEE , OH OHIO STATE LINE DELAWARE M -24997-A ASPHALT RESURFACE AND REJECTED TO BE RE-ADVERTISED PAVEMENT MARKINGS ON SR 32 AT NEBO ROAD, 0.8 km EAST OF US 35 (RP 119+28) ELKHART R -24749-A SMALL STRUCTURE REPLACEMENT NORTHERN INDIANA CONSTRUCTION 262,090.46 11/12/00 ON US 33 FROM 0.07 MILE NORTH MISHAWAKA , IN OF US 6(W. JCT.) OVER BLUE DITCH(RP 74+050) ELKHART T -24628-A TRAFFIC SIGNAL, NEW AND NEW MICHIANA CONTRACTING 176,181.20 10/15/00 KOSCIUSKO FLASHER INSTALLATION ON SR 19 PLYMOUTH , IN AT US 30; ON SR 119 AT CO. RD. 38; US 6 AT CO. RD. 29; SR 15 AT CO. RD. 20 FAYETTE B -21835-A BRIDGE REPLACEMENT ON COUNTY ATLAS EXCAVATING, INC. 349,716.50 06/01/01 ROAD 400N OVER WILLIAMS CREEK, WEST LAFAYETTE , IN 5.0 MILES WEST OF SR 1 FOUNTAIN RS-24894-B ASPHALT RESURFACE ON SR 341 MILESTONE CONTRACTORS, L.P. 1,707,485.84 50 W.D. FROM SR 234 TO US 136 (RP COLUMBUS , IN 0+00 TO RP 10+18) PAGE 2 INDIANA DEPARTMENT OF TRANSPORTATION RUN DATE : June 30, 2000 CONTRACT BID LETTING RESULTS LETTING DATE : June 20, 2000 (BY COUNTY) CONTRACTOR'S DATE TO BE COUNTY CONTRACT # DESCRIPTION - LOCATION CONTRACTOR BID COMPLETED GRANT RS-24813-A ASPHALT RESURFACE ON STATE REJECTED TO BE RE-ADVERTISED ROAD 18 FROM 7.1 MILES EAST OF SR 13(E. JCT.) TO SR 9 IN MARION GRANT RS-24903-B ASPHALT RESURFACE ON SR 15 E & B PAVING, INC. 1,837,528.69 11/17/00 WABASH FROM SR 9 (N JCT) IN MARION ANDERSON , IN TO SR 218 HAMILTON T -24630-A NEW SIGNAL INSTALLATION ON SR REJECTED TO BE RE-ADVERTISED 32 AT PEBBLEBROOK DR/HAZEL DELL ELEMENTARY SCHOOL AND AND ON SR 37 AT 141ST STREET IN FISHERS (RP 081+095) HOWARD M -24886-C INTERSECTION IMPROVEMENT ON MOHR CONSTRUCTION CO 299,263.07 30 W.D. TIPTON US 31/35 FROM SR 22 TO SR 28 KOKOMO , IN AND AT VARIOUS LOCATIONS HOWARD R -24675-A ROAD REHABILITATION ON SR 19 MOHR CONSTRUCTION CO 3,281,509.72 09/29/01 TIPTON FROM SR 28 TO SR 26 KOKOMO , IN JASPER M -24938-A WEDGE AND LEVEL- ASPHALT ON REJECTED TO BE RE-ADVERTISED SR 114 FROM 0.61 km WEST OF US 231 TO 18.59 km EAST OF US 231(JASPER/PULASKI COUNTY LINE) JAY RS-24905-A ASPHALT RESURFACE ON SR 67 L I C A CONSTRUCTION 1,429,428.36 10/01/00 FROM US 27 TO INDIANA/OHIO BERNE , IN STATE LINE JEFFERSON R -24990-B HISTORICAL SITE PRESERVATION REJECTED TO BE RE-ADVERTISED - BEN SCHROEDER SADDLE TREE FAC JEFFERSON COUNTY- BEN SCHROEDER SADDLETREE FACTORY IN MADISON INDIANA LAPORTE R -25023-A ASPHALT RESURFACE ON CO. RD. RIETH RILEY CONSTRUCTION 452,297.47 20 W.D. 100W. FRPM CO. RD. 250S. TO GOSHEN , IN THE CITY OF LAPORTE; ON CO. RD. 75W. FROM 400S. TO CO. RD. 250S.; AND CO. RD.400S LAPORTE R -25024-A ASPHALT RESURFACE ON CO. RD. RIETH RILEY CONSTRUCTION 309,557.38 25 W.D. 400N. FROM PORTER COUNTY LINE GOSHEN , IN TO US 421 AND ON RED APPLE DR. FROM BLECK ROAD TO END OF RED APPLE DR. PAGE 3 INDIANA DEPARTMENT OF TRANSPORTATION RUN DATE : June 30, 2000 CONTRACT BID LETTING RESULTS LETTING DATE : June 20, 2000 (BY COUNTY) CONTRACTOR'S DATE TO BE COUNTY CONTRACT # DESCRIPTION - LOCATION CONTRACTOR BID COMPLETED LAPORTE R -25027-A ASPHALT RESURFACE ON CO. RD. WALSH & KELLY 81,875.02 10 W.D. 600S. FROM CO. RD. 1100W. TO GRIFFITH , IN US 6 LAPORTE R -25078-A DEMOLITION, BUILDING AND REJECTED TO BE RE-ADVERTISED HOUSES, REMOVE ON US 35 FROM .45 MILE NORTHWEST OF SOUTH JCT. WITH SR 39 TO NORTH JCT. OF SR 39 LAWRENCE R -24844-A RUBBLIZE AND ASPHALT OVERLAY AWARD PENDING AND TRAFFIC SIGNAL MODERN. ON SR 37 FROM 0.93 MILE SOUTH SR 54 TO DISTRICT LINE, 5.78 MILES NORTH OF SR 54 (RP 81+015 TO RP 88+000) MARION B -23934-A BRIDGE REHABILITATION ON I-70 ATLAS EXCAVATING, INC. 1,619,792.52 10/14/00 (WB) OVER LEWIS ST, OVER WEST LAFAYETTE , IN FUTURE RAMP, OVER MARTIN- DALE AVE, OVER ROOSEVELT AVE & ON I-70 (EB) OVER BLOYD AVE MARION B -24974-A BRIDGE REHABILITATION ON MILESTONE CONTRACTORS, L.P. 654,392.12 06/01/01 BROOKVILLE ROAD OVER CSXT COLUMBUS , IN RAILROAD, 0.28 km SOUTHEAST OF KITLEY AVENUE IN INDIANAPOLIS MARION B -25067-A BRIDGE DECK PATCHING VARIOUS SCHUTT-LOOKABILL CO 858,497.40 10/31/00 HAMILTON LOCATONS ON I-65, I-70 AND INDIANAPOLIS , IN I-465 MARION M -24996-A GORE BARRIER WALL ON I-465 REJECTED TO BE RE-ADVERTISED (NORTH LEG-EASTBOUND) RAMP FROM SR 431, 4.2 km EAST OF US 31 (RP 33+47) MARION R -24319-B ROAD REHABILITATION AND RIETH RILEY CONSTRUCTION 1,581,570.00 12/01/00 ROADSIDE IMPROVMENT MARION GOSHEN , IN COUNTY- DOWNTOWN CORRIDOR IMPROVEMENT AT VIRGINIA AVE AND DELAWARE ST (CONSECO FIELDHOUSE) IN INDIANAPOLIS MARION T -24721-A TRAFFIC SIGNALS MARION REJECTED TO BE RE-ADVERTISED COUNTY-ON EAST WASHINGTON ST FROM SOUTHEASTERN AVE TO KITLEY AVE IN INDIANAPOLIS PAGE 4 INDIANA DEPARTMENT OF TRANSPORTATION RUN DATE : June 30, 2000 CONTRACT BID LETTING RESULTS LETTING DATE : June 20, 2000 (BY COUNTY) CONTRACTOR'S DATE TO BE COUNTY CONTRACT # DESCRIPTION - LOCATION CONTRACTOR BID COMPLETED MIAMI B -24597-B BRIDGE REHABILITATION ON US AWARD PENDING 31 OVER SOUTH FORK OF DEER CREEK, 2.1 km SOUTH OF SR 18 (RP 168+67) MONROE R -25031-A BIKE/PEDESTRAIN FACILITIES REJECTED TO BE RE-ADVERTISED CLEAR CREEK TRAIL FROM CHURCH LANE TO TAPP ROAD IN BLOOMINGTON NEWTON RS-24802-A ASPHALT RESURFACE ON SR 114 MILESTONE CONTRACTORS, L.P. 748,637.01 45 W.D. FROM ILLINOIS STATE LINE TO COLUMBUS , IN US 41 NOBLE T -24623-A TRAFFIC SIGNALS, QUANTA SERVICES, INC. 109,993.69 11/15/00 HUNTINGTON MODERNIZATION ON US 6 AT MAIN HOUSTON , TX WHITLEY ST. IN KENDALLVILLE; ON SR 9 AT NORTH ST. IN COLUMBIA CITY; ON US224/SR 5 AT BRYANT ST. IN HUNTINGTON PARKE M -24900-A ASPHALT RESURFACE TURKEY RUN REJECTED TO BE RE-ADVERTISED STATE PARK AND RACCOON STATE RECREATION AREA TIPPECANOE R -22339-B INTERSECTION IMPROVEMENT, ATLAS EXCAVATING, INC. 583,518.38 11/15/00 SIGNALS AND LIGHTING US 231 WEST LAFAYETTE , IN AT BECK LANE IN LAFAYETTE VANDERBURGH R -25079-A DEMOLITION ON SR 66 FROM NAAS BROTHERS TRUCKING 53,598.42 11/01/00 WARRICK I-164 TO JUST EAST OF SR 261 HAUBSTADT , IN VERMILLION RS-24511-C ASPHALT RESURFACE ON SR 71 REJECTED TO BE RE-ADVERTISED FROM SR 163 TO US 36 (RP 0+00 TO RP 10+41) WARRICK T -25043-A SIGN MODERNIZATION ALL COUNTY FALCONITE, INC. 520,262.02 11/15/01 ROADS IN WARRICK COUNTY WEST LAFAYETTE , IN =============== TOTAL BID $ 20,969,386.39 PAGE 5 INDIANA DEPARTMENT OF TRANSPORTATION RUN DATE : June 30, 2000 CONTRACT BID LETTING RESULTS LETTING DATE : May 23, 2000 (BY COUNTY) CONTRACTOR'S DATE TO BE COUNTY CONTRACT # DESCRIPTION - LOCATION CONTRACTOR BID COMPLETED CARROLL B -23747-B BRIDGE REPLACEMENT ON US 421 ISOM, JACK CONSTRUCTION CO 4,218,794.03 150 W.D. WHITE OVER LAKE FREEMAN, 2.2 km REYNOLDS , IN SOUTH OF US 24 (RP 160+13) CASS B -24602-A BRIDGE REPLACEMENT ON SR 16 ATLAS EXCAVATING, INC. 791,750.89 11/10/00 OVER ULERICH DITCH, 3.93 km WEST LAFAYETTE , IN WEST OF US 31 AND ON SR 16 OVER EAST BRANCH 12 MILE CREEK, 2.85 km WEST OF US 31 MARION T -24714-A TRAFFIC SIGNALS ON EAST 10TH HOOSIER COMPANY, INC. 674,740.53 11/03/00 STREET FROM COLLEGE AVE TO INDIANAPOLIS , IN ARLINGTON AVE IN INDIANAPOLIS =============== TOTAL BID $ 5,685,285.45 PENDING CONTRACTS: JUNE 20, 2000: R -24844-A; B -24583-A; B -24597-B