IN.gov - Skip Navigation

Note: This message is displayed if (1) your browser is not standards-compliant or (2) you have you disabled CSS. Read our Policies for more information.

Indiana State Board of Animal Health

BOAH > Dairy & Milk > Grade A & Manufactured Grade Products Processing Plants > Plan Review Guidelines for New Plants Plan Review Guidelines for New Plants

PLAN REVIEW GUIDELINE FOR NEW PLANTS

Blueprints for facility layout and equipment must be received and approved before construction begins.

Plans should include:

  1. Layout design
    1. Size and configuration of facility
    2. Separate rooms
    3. Lighting and ventilation (exhaust fans)
    4. Doors & outer openings, drains, floors, walls, ceilings (materials used)
    5. Hand wash sinks, restrooms, break rooms, etc.
    6. Surroundings
  2. Water
    1. Supply (well, city, other)
    2. Cross connections backflow preventers, vacuum breakers, etc.
    3. Glycol and sweetwater tanks
  3. Waste disposal
    1. Municipal or private
    2. Compactor or dumpster
  4. Piping
    1. Product
    2. CIP
    3. Cross connections
    4. Design & material
  5. Equipment
    1. HTST, UHT, HHST, and Vats
    2. Fillers
    3. Silos and Tanks
    4. Design, materials, and manufacturer
  6. Coolers
    1. Locations
    2. Size
    3. Temperature recording devices

Plans should also include the name, address and phone numbers of any consultants, architects, contractors, subcontractors and other approving government agencies.