Skip to content

Indiana Department of Transportation

< Back | Agency Home | Submit Events >

Search events. View events.
  Transportation, Indiana Department of Submit Events
Welcome to the IN.gov Calendar. Please use the Help button to the right for any assistance while using the Calendar.
Click for help in using calendar displays. Print the contents of the current screen.

Advanced Search (New Search)
  From:
  To:

 

 

 


Submit
Entry Details
Notify me if this event changes.Add this event to my personal calendar.Email this entry to a friend.
Go Back
[INDOT] Indianapolis Traffic Restrictions Update
Start Date: 9/14/2012Start Time: 12:00 AM
End Date: 9/14/2012
Entry Description

Indianapolis Traffic Restrictions Update 

NORTH SIDE:

  • I-465 westbound traffic is shifted to the right between I-69 and Allisonville Road.  Three lanes of traffic will be open during daytime hours, but additional lane restrictions in both directions should be expected between 9 p.m. and 6 a.m. for the next four weeks.
  • I-69 southbound to I-465 westbound ramp is restricted to a single lane for the next four weeks.
  • I-465 westbound will not have a designated exit lane for northbound Allisonville Road for the next four weeks, but the exit ramp will remain open.

I-465 & Allisonville Road Interchange:

  • Additional work to replace a broken water main within the construction limits of the Allisonville Road bridge and interchange project is expected to take about two weeks.  The new bridge is anticipated to open by the end of September.
  • The Allisonville Road bridge over I-465 closed on Wednesday, May 30 for reconstruction.  Through traffic on Allisonville Road and left turns at the interchange remain prohibited until construction of the new bridge is complete.  Right turns entering and exiting the interstate are open.
  • A 45 mph work zone speed limit on I-465 approaching Allisonville Road in both directions is in effect when signs are flashing during working hours.  Drivers should reduce speeds on I-465 and the Allisonville Road ramps.  Drivers should be alert for construction workers in the area, heavy trucks entering and exiting the roadway and Indiana State Police patrolling the work zone.

I-69 Operation Indy Commute

  • I-69 northbound is restricted to two lanes beginning at Exit 205 to 116th Street and SR 37 for construction of a two-lane flyover ramp to SR 37.

US 31 at SR 38

  • US 31 traffic in both directions through the construction zone at SR 38 is expected to shift to the right lanes on each side of the median on Monday, September 17.
  • US 31 at SR 38 is one lane in each direction with shifting work zone traffic patterns via median crossovers.  US 31 northbound and southbound access to SR 38 is closed.

US 31 at Keystone Parkway & 146th Street

  • Range Line Road will have short-term stoppages of up to 10 minutes each on Monday, September 17 between 12:30 p.m. and 3 p.m. as beams are placed on the new US 31 overpass.
  • Northbound Keystone parkway access to US 31 closed for 80 days on Monday, July 30.  The Hagan-Burke Trail will also be closed for up to three consecutive days each week as the northbound Keystone Parkway bridge over Cool Creek is reconstructed.
  • US 31 northbound is redirected via median crossovers to share new pavement on the west side of the roadway with southbound traffic between 151st Street and the Monon Trail south of Range Line Road.  Two through lanes are maintained in each direction. 

EAST SIDE:

  • I-70 eastbound will have a right lane restriction east of Post Road (Exit 91) Saturday, September 15 between 4 a.m. and 6 a.m.
  • I-70 in both directions from Post Road (Exit 91) to just east of Mt. Comfort Road (Exit 96) has two lanes of traffic through a construction work zone.  I-70 westbound has a 45 mph work zone speed limit in effect.  I-70 eastbound has shifting traffic patterns with median crossovers. 

WEST SIDE:

  • US 40/West Washington Street in both directions between I-465 and Glen Arm Road will shift to the north side of the road on Monday, September 17.
  • I-465 northbound and southbound between 34th and 21st Streets has a split traffic pattern.  A 45 mph express lane, with a truck restriction and no exit ramp access, splits to the median while two lanes with ramp access remain on the right.
  • US 136 and Crawfordsville Road have a 30 mph work zone speed limit in effect.  High School Road is restricted to a single lane in each direction north of Crawfordsville Road.
  • US 40/West Washington Street has two lanes in each direction between I-465 and Glen Arm Road.  Eastbound traffic is on the south side of the road, and westbound traffic is on new pavement on the north side of the road.
Default
Entry Type:
Press Release
Entry Category:
  • Alerts and Notification
  • IN.gov Category:
  • Public Safety
  • Tourism & Transportation
  • Agency Name
    Transportation, Indiana Department of

    Calendar software powered by Active Data Calendar   
    Select item(s) to Search








    Select item(s) to Search
    Select item(s) to Search

    Select item(s) to Search